Construction Services

Construction, Security Systems and Facilities Support

Twenty service lines across four capability areas — from site preparation through closeout, the electrical and security systems inside the building, and the support that keeps it running.

Capability areas

Capability Area

General Construction

Ground-up commercial, institutional and residential building, plus renovation, build-out and the site work that gets a project out of the ground.

Completed brick elevation of a custom estate residence built by Agile1Tech
Capability Area

Interior Finishes

The finish trades a client actually walks through and judges — flooring, window treatments, paint and architectural finishes.

Restored hardwood flooring in a wood-panelled historic room
Capability Area

Electrical & Security Systems

Licensed electrical work and electronic security systems — access control, video surveillance and intrusion detection — for secure federal facilities.

Electrical rough-in and panel installation within framed walls
Capability Area

Facilities & Project Support

Keeping facilities running and projects controlled: maintenance, material supply, construction management, quality control and safety.

Completed hall with new carpet, lighting and finishes
How We Deliver

Construction Delivery Process

The same six stages on every project, whatever the service line.

  1. Requirement Review

    We read the solicitation, drawings and specifications before we price anything, and we raise questions during the Q&A window rather than after award. Scope gaps found here cost nothing to fix.

  2. Planning & Preconstruction

    Constructibility review, schedule development and a procurement plan for long-lead items. The client sees the baseline schedule before mobilization, not after the first delay.

  3. Mobilization & Procurement

    Site setup, submittals, subcontractor onboarding and material ordering against the approved schedule. Access, badging and site rules are settled before crews arrive.

  4. Construction Execution

    Sequenced trade work under daily supervision, phased around building occupants where the facility stays in use. Progress is reported against the baseline, not against a moving target.

  5. Quality & Safety Control

    Three-phase quality control - preparatory, initial and follow-up - with daily reports, deficiency logs and safety documentation maintained throughout rather than assembled at the end.

  6. Inspection, Closeout & Handover

    Punch list resolution, final inspection support, and a closeout package with as-builts, O&M manuals and warranties assembled so the contracting officer can accept the work without chasing paperwork.